Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Jul 28, 2023     46-2 Engine Mount and landing gear Step 1 - (3 hours) Category: Firewall
Preliminary installation of steel passthrough on the firewall for the AWG2 wire to the starter contactor and for the AWG8/AWG6 from starter contractor to main bus.removed the engine mount to facilitate drilling. Removed oil cooler for easier work.
Riveted brake line bracket to the rudder pedal brace (F-1039D). I made the brake line bracket in an earlier step and i needed help to rivet in place due to the awkward position.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.