Preliminary installation of steel passthrough on the firewall for the AWG2 wire to the starter contactor and for the AWG8/AWG6 from starter contractor to main bus.removed the engine mount to facilitate drilling. Removed oil cooler for easier work.
Riveted brake line bracket to the rudder pedal brace (F-1039D). I made the brake line bracket in an earlier step and i needed help to rivet in place due to the awkward position.